First Bit Of Mud Coming Down
Ready For the 9 Yard Pour
After The Pour
Tower Ready To Be Raised
Tower Halfway Up
Tower Uprighted
Cable Tray Installed
Heliax Clamps Installed Every 4 Feet
Surge Box Before Strike
Surge Box After Strike
Surge Box With Coax Entry Box
Coax Entry Box
GP 9 Melted After Direct Strike. No Damage To Any Equipment All Was Hooked Up. Ufer Grounding Works! This Was The Second Strike With No Damage.
Big Job Producing This Hole
Where The Wife Said I Will Wind Up If Much More of Money Goes Into This Project
HDBX 48 To US Tower HDX 538 Plate Adapter
The guys on 147.420 tuning up the 2 meter amps.